Institutional

Institutional – Case Study

Project Highlights:

Project Location: VMV College Nagpur

Project Size: 15 KWP

Project Completion Time: 1 Month

Roof Area: 160 Sq.meter

No. of Modules: 52

Module Technology: Crystalline SI, 320 WP

Inverter: 15 KW

Energy Generation: 24MW/year

Connection Type – Grid Connected

Challenges and Solutions

  • The execution of the deliverables involved proper structuring & planning
    Working in tandem with a fully operational educational institute required stringently maintaining the health & safety of the workforce as well as the students & faculties.
  • Engineering optimization of each component was required for the shadow-free zone to accommodate the 15 kW of PV installation
  • Optimization of working hours was done using additional deployment of manpower to ensure strict adherence to the stipulated timeframe.

Work Methodology

  • Timeline – 1.5 Month for Completion of the project from the date of Purchase Order